Sydney's education-sector builder
Refurbishments, fitouts and civil works for NSW schools — programmed around the term, handed over ready for Day 1. We work with School Infrastructure NSW, the Department of Education, Catholic and independent schools across Sydney.
How we work
School works happen in the windows schools can afford: holidays, weekends, staged zones inside live campuses. We build the programme around the school calendar — not the other way around.
Safety Management Plan v1.7.9, SWMS and JSA on every site, inductions and daily sign-ins, monthly WHS contractor reporting to SINSW, works delivered to NCC and EFSG standards.
Riverwood Public School's only bathroom block was stripped and rebuilt inside a Christmas shutdown — commissioned and handed over before students returned. That is the standard.
Capability
Six service lines, one vocabulary — every service links to a delivered project.
Classrooms, CAPA and specialist spaces, amenities blocks — rebuilt to SINSW and EFSG standards inside live schools.
Proof: Chifley College CAPA refurbishmentJoinery, acoustics, learning technology and new internal spaces — including purpose-built facilities.
Proof: the Chifley recording studioSubsoil drainage, stormwater renewal, oval remediation, pathways and reinstatement.
Proof: Meadowbank oval drainageDefect rectification, foundation repair, reroofing and waterproofing — diagnosed properly, fixed once.
More on capabilityHead-contractor delivery across multi-trade programmes, weekly reporting, SINSW WHS reporting built in.
More on capabilityThe same disciplines for councils, healthcare and government facilities — our adjacent sectors.
More on capabilityRecent work

Two art rooms, two music rooms and a brand-new recording studio — without losing a teaching day.

The school's only bathroom block, rebuilt inside the Christmas shutdown — handed over before Day 1 of Term 1.

A drainage grid under the oval ended years of waterlogging and erosion.
The difference
Most builders treat school work as one sector among many. We made it the whole business: every project All Day Building has delivered is a NSW school.
Term-break windows fill 6–10 weeks ahead. Send us the scope early and we will programme around your school.
Enquire today