School refurbishment & fitout
School refurbishments and fitouts in Sydney
Classrooms, creative arts spaces and specialist facilities. Refurbishment and fitout work planned around how schools use their buildings, with delivered work at Chifley College Dunheved Campus.
Discuss your school projectWhat the work can include
Existing spaces, rebuilt for the way schools work
Classrooms and specialist rooms
Internal refurbishment of teaching spaces, from strip-out and services upgrades to new ceilings, floor finishes and joinery.
Creative arts and acoustic spaces
Music and art rooms, acoustic treatment and purpose-built facilities. The Chifley project included a new recording studio and sound room.
Fitout and learning technology
Joinery, finishes and integrated learning technology, coordinated as part of the room refurbishment.
Work inside an operating school
Staged work zones and sequenced trades. At Chifley, the internal refurbishment was delivered while the school continued teaching.
Delivered work
Chifley College CAPA refurbishment
Creative and performing arts spaces
At Chifley College Dunheved Campus, the work covered two art rooms, two music classrooms, storage and the Block C corridor. The refurbishment included new ceilings, acoustic treatment, floor finishes, joinery and learning technology, plus a new recording studio and sound room.
View the Chifley College refurbishment
Related school works
Explore the wider scope
School bathrooms and amenities
Explore the Riverwood Public School bathroom rebuild for a wet-area refurbishment delivered during the Christmas shutdown.
School bathroom and amenities upgradesSchool stormwater and civil works
For drainage and external works, see the Meadowbank and Jannali projects.
School stormwater and civil worksHave a refurbishment or fitout scope?
Send the room list, drawings or works description, along with the preferred timeframe and any access constraints.
Discuss your school project