School bathroom & amenities upgrades
School bathroom and amenities upgrades in Sydney
Bathroom blocks and wet areas, from strip-out through to fixtures, finishes and commissioning. See how the Riverwood Public School bathroom rebuild was delivered within its Christmas shutdown.
Discuss your amenities projectWhat the work can include
A coordinated rebuild, from strip-out to handover
Strip-out and preparation
Removal of existing fixtures, partitions and finishes, with trade sequencing planned around the works window.
Hydraulic services and fixtures
New hydraulic services, cubicle partitions, troughs and fixtures. At Riverwood, stainless troughs and fixtures were selected for durability and hygiene.
Waterproofing and finishes
Wet-area waterproofing, tiling, wall linings and ceilings, coordinated with the services and fixture installation.
Testing and commissioning
Testing, commissioning and final cleaning formed part of the Riverwood handover before the school reopened.
Delivered work
Riverwood Public School bathroom rebuild
The school's student bathroom block
Riverwood Public School had one student bathroom block. The project stripped it back and rebuilt it during the Christmas shutdown, including new hydraulic services, waterproofing, tiling, partitions and fixtures. The completed block was handed over before Day 1 of Term 1.
View the Riverwood bathroom refurbishment
Related school works
Explore the wider scope
School refurbishments and fitouts
Planning work beyond the bathroom block? Explore the Chifley College project for classrooms and specialist learning spaces.
School refurbishments and fitoutsSchool stormwater and civil works
For work outside the buildings, explore the drainage and surface reinstatement projects at Meadowbank and Jannali.
School stormwater and civil worksPlanning an amenities upgrade?
Send the existing layout, photographs or scope of work, along with the preferred works window and any access requirements.
Discuss your amenities project